Approach
A core team gave Asphalt an owner, a plan, a way to measure it and a release schedule. I led the core team as a lead individual contributor: roadmap, OKRs (objectives and key results) and rituals. I co-wrote its charter with a teammate, and we set the team up from the ground up. The role also covered the discussions with leadership, and I was lead designer on hands-on projects. The team worked regularly with 5 UX and platform engineers.
Team and planning. The team ran on a few fixed habits:
Rituals. Weekly stand-ups and library updates, critiques when needed, and a UX-engineering sync every 2 weeks.Audits on a schedule. Tokens every 6 months, master components every 3 and patterns every 2.A place in every project. 3 design-system touchpoints in the interaction-design workflow, 1 of them optional.One review flow. Shared by product, the design system and UX engineering, from wireframes to handoff.
The team planned with OKRs for 2 cycles. Focus groups with product teams surfaced the top problems; the biggest was the process for adding new components. We turned the top problems into 6 key results and chose 4, with RICE scoring (reach, impact, confidence, effort) as one input. Each cycle took about 3 weeks, from discovery to key results agreed with 3 business-unit leads and product managers. I also owned one key result, on text scaling.
Earlier, I ran focus groups on where Asphalt should go next, as part of my 2-year vision. 25 people took part, in 5 groups of 5: one from the design-system team and 4 cross-functional groups. We narrowed 18 ideas to 16 possible actions, then 5 goals.
Measurement and training. I ran the usability baseline, the workshops and the sharing sessions, and wrote the KPI inventory, the impact-report template, the dashboard proposal and the framework that judged each workshop.
Usability score by role, against the common benchmark of 68
Benchmark 68
Front-end engineers 70.4
Designers 61.8
Managers 56.7
All 47 people 64.6
A usability baseline. A System Usability Scale survey, scored by role.Metrics. A KPI inventory listed about 47 metrics in 8 groups. Some had targets, such as 80% design-system coverage. The team used the impact-report template for its project reports.A dashboard proposal. A request for comments (RFC) proposed one dashboard for 5 data sources, from adoption to usability scores. It wasn't built; it became my key result in the next OKR cycle.Workshops. Designers learned to use the system in their own work. An interaction-design learning class ran 6 classes for 13 people across 2 teams. Sharing sessions covered system updates for the interaction-design team, and a goals, signals and metrics framework judged each workshop.
Libraries and releases. Asphalt had two design libraries: the main library of core components, and the workshop library, a shared home for product-specific ones. Product needs move faster than a design system can always keep up with, so teams built components locally, unaware of similar ones elsewhere. I maintained both libraries and wrote the processes that connected them, plus the documentation template, review checklist and versioning doc they relied on.
The key call was opening contribution to every Gojek designer, through the workshop library instead of local project files.
Contribution. Designers built in their product's page of the workshop library, and published after a design-system review.Audit and promotion. We audited the workshop library every month. When 2 or more products needed the same or a near-identical component, it moved toward the main library: a ticket, design-system and UX-engineering reviews, then release once its code had started.Change. A standard process of 7 steps for component changes lined up UX engineering, the core team, product designers and product developers. A library update couldn't publish until its code date was known.Deprecation. A deprecation ran in stages over 3 to 6 months, or at once for a component with no usages. I ran 2 deprecations as the person in charge.Quality. The component documentation template grew to 15 sections, from overview to changelog. The component review checklist had 12 categories and about 34 criteria.Releases. Versioned releases with weekly release notes. The versioning doc gave each release a semantic version number.
When Gojek moved from Sketch to Figma, I co-led moving Asphalt's libraries and product files, wrote the Figma onboarding guide and ran the onboarding workshops. By my estimate, moving to one tool also saved $26,000+ a year in licenses.